Acoustic Box Blower Building
- Client: Kirkland Lake Gold
- Location: Bendigo, Victoria
- Date: 2020
View project
Newmont Gold’s Tanami operations are located in the Tanami Desert in the Northern Territory. The Twin Hills Village Water Treatment Plant supports critical village and site water treatment requirements.
The existing Reverse Osmosis units had been operating since 2000, with RO2 and RO5 becoming increasingly difficult to maintain due to age, wear and deterioration. The control panels also no longer met Newmont’s current standards for wiring, PLC hardware, switchgear and control system configuration.
The project objective was to decommission the existing RO units and replace them with new, upgraded units suitable for the area’s expected water treatment demand.
EMtek was engaged to provide multidisciplinary engineering design and detailing for the new RO plant, covering:
EMtek delivered a coordinated design package to support the replacement of the ageing RO infrastructure and integration of the new plant into the existing water treatment system.
Key services included:
The completed design package provided Newmont with a practical pathway to replace ageing RO assets with upgraded infrastructure aligned to current site standards, operational requirements and long-term maintainability.