---
title: Earthing
date: 2026-02-03T13:18:00+11:00
author: Joel
canonical_url: "https://emtek.com.au/earthing"
section: Site Content
---
1. [ Home](https://emtek.com.au/)
2. [ What We Do ](https://emtek.com.au/what-we-do)
3. [ Power ](https://emtek.com.au/power)
4. Earthing
 
 

# Earthing

 

 

 

 

EMtek design earthing and lightning protection systems to manage fault energy safely, control step/touch risk, and meet client and standard requirements in high-consequence environments.

 

 

 

 

 

- [ Our Capabilities ](#our-capabilities)
- [ Related Project Highlights ](#related-project-highlights)
 
 

 

 

 

 

 

 

 

- 
- [ Our Capabilities ](#our-capabilities)
- [ Related Project Highlights ](#related-project-highlights)
 
  ![Earthing](https://emtek.com.au/volumes/images/Content/_1920xAUTO_crop_center-center_none/50054/Earthing.webp) 

 

 

 ![Earthing](https://emtek.com.au/volumes/images/Content/_1920x1080_crop_center-center_none/50054/Earthing.webp) 

 

 

### Our Capabilities

- **Soil Modelling &amp; Design Inputs:** Reviewing soil test data and modelling scenarios to establish a defensible basis for earthing design.
- **EPR and Step/Touch Assessments:** Analysing earth potential rise and step/touch voltages, with practical design adjustments to achieve safe outcomes.
- **Standards-Based Compliance:** Designing to relevant standards and guidance (e.g., AS 2067, AS/NZS 3000, IEEE 80, ENA guidance) and specific client requirements.
- **Lightning Protection Engineering:** Designing lightning protection to AS 1768 using appropriate assessment methods, with grounded, buildable detailing.
- **EMF / Interference Considerations:** Assessing EMF and interference risks where required and incorporating mitigation into layouts and connections.

 

 

 

 

 

 

 

 

 ##### Related Project Highlights

  [  ![MTK25074777 20240528 123242](https://emtek.com.au/volumes/images/Content/_600x600_crop_center-center_none/53303/20240528_123242.webp) 

 

 ### Appin East Main Slope and Surface Elevator Conveyor Upgrade

- **Client:** GM3
- **Location:** Appin, New South Wales
- **Date:** 2025
 
 View project   

  ](https://emtek.com.au/projects/appin-east-main-slope-and-surface-elevator-conveyor-upgrade) 

  [  ![ROM4](https://emtek.com.au/volumes/images/Content/_600x600_crop_center-center_none/39580/ROM4.webp) 

 

 ### ROM4 Overland Conveyors

- **Client:** Nepean, Roy Hill
- **Location:** Pilbara, Western Australia
- **Date:** 2022 - 2023
 
 View project   

  ](https://emtek.com.au/projects/rom4-overland-conveyors) 

  [  ![Hall Hub Rail Crossing](https://emtek.com.au/volumes/images/Content/_600x600_crop_center-center_none/39537/Hall-Hub-Rail-Crossing.webp) 

 

 ### Hall Hub Development Overland Conveyor

- **Client:** Fortescue
- **Location:** Pilbara, Western Australia
- **Date:** 2023 - 2024
 
 View project   

  ](https://emtek.com.au/projects/hall-hub-development-overland-conveyor)
