Maxwell Drift Conveyor Head End and Stacker
- Client: Nepean Conveyors
- Location: Maxwell Project, Woodlands Drift
- Date: 2024
View project
The Onslow Iron Port Project involved the engineering and design of major port-side materials handling infrastructure, including a large storage shed fed by a travelling tripper, multiple conveyors, a surge bin, and integration with a reclaimer and ship loader. Following preliminary engineering by CSI, EMtek was engaged to progress the concept through to final engineering and detailing, providing the design development required to support fabrication, construction and delivery of the port facility.
Mtek delivered mechanical, structural and concrete engineering and design for key conveyor and transfer infrastructure within the port materials handling system, including the CV01/CV02 Transfer Station, CV03 Drive and GTU Station, CV03 to CV04 Transfer Station, Sample Station and CV04 Head End.
Key areas of delivery included:
This work provided the detailed engineering and shop-detailing package needed to take the port conveyor system from concept design through to implementation.