title: Rougher Jameson Cell Project
date: 2026-04-23T16:35:00+10:00
author: Joel
canonical_url: "https://emtek.com.au/projects/rougher-jameson-cell-project"
section: Projects
---
1. [ Home](https://emtek.com.au/)
2. [Projects](https://emtek.com.au/projects)
3. Rougher Jameson Cell Project
 
 

 

 

 

  ![PXL 20240717 224432985](https://emtek.com.au/volumes/images/Content/_3500x1800_crop_center-center_none/53330/PXL_20240717_224432985.webp) 

#  Rougher Jameson Cell Project 

- **Client:** BHP / OZ Minerals
- **Location:** Glendambo, South Australia
- **Date:** 2023
 
 

 

 

 

 

 

 

  ### Project Overview and Scope

The Rougher Jameson Cell Project at OZ Minerals’ Prominent Hill Mine was developed to improve copper control and recovery ahead of the rougher flotation circuit in preparation for upcoming ore deposits. Following EMtek’s earlier capital cost estimate and concept layout work, EMtek was engaged to deliver the detailed engineering and design for installation of the new Jameson Cell facility and its supporting infrastructure. The scope included integration of the new cell into the existing process plant, together with the piping, structural, mechanical and electrical works required to support procurement, construction planning and installation.

 

### Services and Outcome

EMtek provided detailed multidisciplinary engineering and design for the Rougher Jameson Cell balance of plant, progressing the project from concept into a construction-ready design package.

Key areas of delivery included:

- Mechanical, piping, structural and electrical design for the new Jameson Cell facility
- Integration works including tie-ins to the existing flotation circuit, sampler modifications, new launders and associated pipework
- Design of support structures, stair towers, access platforms, hoppers, pump systems, foundations and bunded areas
- Electrical and instrumentation design for new pump VSDs, instrumentation and switchroom integration
- Development of procurement data, construction scope documentation and detailed design deliverables
- Technical support for construction and commissioning

Deliverables included process drawings, 3D model outputs, general arrangement drawings, piping isometrics, structural and concrete drawings, shop detail drawings, equipment data, schedules, material take-offs, engineering calculations and electrical and instrumentation drawings.

 

 

 

 

 

   [  ![20230308 124144](https://emtek.com.au/volumes/images/Content/_2100x1350_crop_center-center_none/53341/20230308_124144.webp) ](https://emtek.com.au/volumes/images/Content/_1800xAUTO_crop_center-center_80_none/53341/20230308_124144.webp)  

  [  ![Picture1](https://emtek.com.au/volumes/images/Content/_2100x1350_crop_center-center_none/53337/Picture1.webp) ](https://emtek.com.au/volumes/images/Content/_1800xAUTO_crop_center-center_80_none/53337/Picture1.webp)  

  [  ![Picture2](https://emtek.com.au/volumes/images/Content/_2100x1350_crop_center-center_none/53338/Picture2.webp) ](https://emtek.com.au/volumes/images/Content/_1800xAUTO_crop_center-center_80_none/53338/Picture2.webp)  

  [  ![20230308 121334 B](https://emtek.com.au/volumes/images/Content/_2100x1350_crop_center-center_none/50043/20230308_121334-B.webp) ](https://emtek.com.au/volumes/images/Content/_1800xAUTO_crop_center-center_80_none/50043/20230308_121334-B.webp)  

 

 

 

 

 ## Related Projects

 

 

  [  ![Carrapetina Underground Conveyors Pre feasibility Study Main 1 1](https://emtek.com.au/volumes/images/Projects/2015/_600x600_crop_center-center_none/27724/Carrapetina-Underground-Conveyors-Pre-feasibility-Study-Main-1-1.webp) 

 

 ### Underground Conveyors Pre-feasibility Study

- **Client:** Oz Minerals
- **Location:** South Australia
- **Date:** 2015 - 2016
 
 View project   

  ](https://emtek.com.au/projects/underground-conveyors-pre-feasibility-study) 

  [  ![20250508 162800](https://emtek.com.au/volumes/images/Content/_600x600_crop_center-center_none/53359/20250508_162800.webp) 

 

 ### Kennecott Utah Copper C6 Control System Project

- **Client:** Rio Tinto
- **Location:** Salt Lake City, Utah
- **Date:** 2024
 
 View project   

  ](https://emtek.com.au/projects/kennecott-utah-copper-c6-control-system) 

 

 

 

 