Bigge Crushing and Conveying
- Client: Fortescue
- Location: Pilbara, Western Australia
- Date: 2020 - 2021
View project
The Rougher Jameson Cell Project at OZ Minerals’ Prominent Hill Mine was developed to improve copper control and recovery ahead of the rougher flotation circuit in preparation for upcoming ore deposits. Following EMtek’s earlier capital cost estimate and concept layout work, EMtek was engaged to deliver the detailed engineering and design for installation of the new Jameson Cell facility and its supporting infrastructure. The scope included integration of the new cell into the existing process plant, together with the piping, structural, mechanical and electrical works required to support procurement, construction planning and installation.
EMtek provided detailed multidisciplinary engineering and design for the Rougher Jameson Cell balance of plant, progressing the project from concept into a construction-ready design package.
Key areas of delivery included:
Deliverables included process drawings, 3D model outputs, general arrangement drawings, piping isometrics, structural and concrete drawings, shop detail drawings, equipment data, schedules, material take-offs, engineering calculations and electrical and instrumentation drawings.