---
title: Western Turner Syncline 2
date: 2023-12-22T10:38:00+11:00
author: Walker Designs
canonical_url: "https://emtek.com.au/projects/western-turner-2"
section: Projects
---
1. [ Home](https://emtek.com.au/)
2. [Projects](https://emtek.com.au/projects)
3. Western Turner Syncline 2
 
 

 

 

 

  ![Western Turner 2 Bottom 1](https://emtek.com.au/volumes/images/Projects/2019/_3500x1800_crop_center-center_none/28272/Western-Turner-2-Bottom-1.webp) 

#  Western Turner Syncline 2 

- **Client:** Mondium, Rio Tinto
- **Location:** Pilbara, Western Australia
- **Date:** 2019
 
 

 

 

 

 

 

 

  ### Project Scope

EMtek and Mondium were engaged by Rio Tinto in joint venture to an EPC style contract to complete all works for the Western Turner 2 project, including the crushing plant, OLC, 33KV power distribution system, NPI Facilities, associated water controls and communication systems. The WTS Phase 2 Stage 2 project was then required to expand production of WTS2 from the 8.8Mtpa road train operation to a capacity suitable to sustain the Tom Price process plant at a rate of 30Mtpa crusher feed. EMtek and Mondium collaboratively completed the detailed engineering and design with no disruption to the critical path of the project schedule.

 

### Major Work Inclusions

- Primary Crushing Station – Control System engineering and design to include PLC and SCADA for the process control and interface,
- Primary crusher discharge conveyor,
- Transfer Station including all mechanical, structural, concrete, earthworks, electrical, and control systems,
- Overland Conveyor including all earthworks, drainage, hydrology, and tie into the existing Overland conveyor,
- Commissioning including no-load, energized, loaded and 2 weeks operational.

### Key Project Components

- Mechanical Engineering and Design
- Structural Engineering and Design, including Concrete
- OLC Civil Design
- Electrical Engineering and Design
- Shop Detailing
- DEM Modelling
- Complete Plant Control System PLC and SCADA
- Load and Operations Commissioning and support

 

 

 

 

 

   [  ![Western Turner 2 Bottom 1](https://emtek.com.au/volumes/images/Projects/2019/_2100x1350_crop_center-center_none/28272/Western-Turner-2-Bottom-1.webp) ](https://emtek.com.au/volumes/images/Projects/2019/_1800xAUTO_crop_center-center_80_none/28272/Western-Turner-2-Bottom-1.webp)  

  [  ![Western Turner 2 Main 1](https://emtek.com.au/volumes/images/Projects/2019/_2100x1350_crop_center-center_none/28282/Western-Turner-2-Main-1.webp) ](https://emtek.com.au/volumes/images/Projects/2019/_1800xAUTO_crop_center-center_80_none/28282/Western-Turner-2-Main-1.webp)  

  [  ![WTS2 2](https://emtek.com.au/volumes/images/Content/_2100x1350_crop_center-center_none/39515/WTS2-2.webp) ](https://emtek.com.au/volumes/images/Content/_1800xAUTO_crop_center-center_80_none/39515/WTS2-2.webp)  

 

 

 

 

 ### Download Fact Sheet

 

 [ #### MTK 0000 FCT QA 0014 Rio Tinto WTS Fact Sheet

 

 363.9 KB

 

 

 ](https://emtek.com.au/volumes/documents/Case-Studies/MTK-0000-FCT-QA-0014-Rio-Tinto-WTS-Fact-Sheet.pdf) 

 

 

 

 

 ## Related Projects

 

 

  [  ![Solomon Direct Train Loading](https://emtek.com.au/volumes/images/Projects/2019/_600x600_crop_center-center_none/28138/Solomon-Direct-Train-Loading.webp) 

 

 ### Solomon Direct Train Loading

- **Client:** Fortescue
- **Location:** Pilbara, Western Australia
- **Date:** 2019
 
 View project   

  ](https://emtek.com.au/projects/solomon-direct-train-loading) 

  [  ![MTK24044002 IMG 8795](https://emtek.com.au/volumes/images/Projects/_600x600_crop_center-center_none/54784/IMG_8795.webp) 

 

 ### Maxwell Drift Conveyor Head End and Stacker

- **Client:** Nepean Conveyors
- **Location:** Maxwell Project, Woodlands Drift
- **Date:** 2024
 
 View project   

  ](https://emtek.com.au/projects/maxwell-drift-conveyor-head-end-and-stacker) 

 

 

 

 

[View all Projects](https://emtek.com.au/projects)
