EMtek and Mondium were engaged by Rio Tinto in joint venture to an EPC style contract to complete all works for the Western Turner 2 project, including the crushing plant, OLC, 33KV power distribution system, NPI Facilities, associated water controls and communication systems. The WTS Phase 2 Stage 2 project was then required to expand production of WTS2 from the 8.8Mtpa road train operation to a capacity suitable to sustain the Tom Price process plant at a rate of 30Mtpa crusher feed. EMtek and Mondium collaboratively completed the detailed engineering and design with no disruption to the critical path of the project schedule.