EMtek conducted an analysis for the existing transfers on conveyors CV113 and CV123 to increase production output and reduce unplanned stoppages for industry-leading Fortescue. Detailed design was then conducted on proposed changes and modifications were identified. With the increase in site production rates, the chutes were identified as potential bottlenecks to production. The project was successfully developed to accommodate the current and future production goals of Kings OPF.