Project Scope
EMtek was proud to partner with Fortescue on the Transfer Chute Upgrade project scope through the following deliverables.
- Re-design of an adjustable deflector plate with tapered outlet to control the flow of material into the lower chute.
- Rotatable lower chute, improving mass flow and reducing the sensitivity to variables, which cause belt tracking issues.
- Increased belt life by providing greater protection from direct rock impact and reducing belt shear.
- Mid chute fixed and supported from above.
- Refinement of existing geometry.
- Permanent access platform around lower chute section.
- Lower chute with trolley loading system for maintenance.
- Spillage catchment under transfer chute.
- Spillage catchment under Conveyor with launder to ground bunker.
- Updates to guards at Conveyor transfer station.