
Gap Tonnes Study
- Client: Rio Tinto Ltd
- Location: Pilbara, Western Australia
- Date: 2015 - 2016
View project
EMtek, working in a partnership with Sedgman Civmec joint venture (SCJV) and BHP developed the Western Ridge Crusher (WRC) Project in Western Australia. The objective of the project was to sustain the Newman Joint Venture Mining and Processing Hub (NJV Hub) production. The Project connects the existing NJV Hub’s operations to the Silver Knight and Mt Helen ore deposits located on the western side of Western Ridge.
EMtek’s scope included the detailed engineering, design, and shop detailing through to IFC for Overland Conveyors CV104 and CV105, including take up assemblies, loading area assemblies, low level module assemblies, ore analyser platforms, belt splicing stations, pedestrian cross overs, creek crossing assemblies, head end transition modules and truss assemblies, drive station, head-end washdown chutes and head end assemblies. EMtek took the study level design completed by others and was able to optimise the arrangement which saved over 1000 tonnes of steel on one conveyor alone and significantly reduced onsite man hours.