---
title: Gap Tonnes Study
date: 2023-12-22T10:09:00+11:00
author: Walker Designs
canonical_url: "https://emtek.com.au/projects/hope-downs-1-gap-tonnes-study"
section: Projects
---
1. [ Home](https://emtek.com.au/)
2. [Projects](https://emtek.com.au/projects)
3. Gap Tonnes Study
 
 

 

 

 

  ![Hope Downs 1 Gap Tonnes Study 2](https://emtek.com.au/volumes/images/Projects/2015/_3500x1800_crop_center-center_none/27802/Hope-Downs-1-Gap-Tonnes-Study-2.webp) 

#  Gap Tonnes Study 

- **Client:** Rio Tinto Ltd
- **Location:** Pilbara, Western Australia
- **Date:** 2015 - 2016
 
 

 

 

 

 

 

 

  ### Project Scope

When Rio Tinto considered options to increase the current capacity of the HD1 South Plant to meet the future needs of their operation, EMtek prospered at the opportunity to innovate. The current system at the HD1 South Plant was operating below setpoint due to numerous bottleneck constraints. EMtek was engaged to address the current capacity constraints to improve the performance of overland conveyor in combination with improvements to the control system and modification of the transfer chutes. The successful result enabled Rio Tinto to increase throughput to the future planning requirements.

 

### Major Work Inclusions

- Identify constraints in the flow sheet taking into account the range of feed parameters.
- Investigate potential options and conduct concept level engineering for each process element to increase throughput.
- Develop order of magnitude costs for each improvement option.
- Conduct workshops with all key stakeholders to agree on priorities for implementation.
- Develop SOW’s for each focus area.
- Measure actual improvement value by proceeding with agreed scope, budget and schedule.

 

 

 

 

 

   [  ![Hope Downs 1 Gap Tonnes Study 2](https://emtek.com.au/volumes/images/Projects/2015/_2100x1350_crop_center-center_none/27802/Hope-Downs-1-Gap-Tonnes-Study-2.webp) ](https://emtek.com.au/volumes/images/Projects/2015/_1800xAUTO_crop_center-center_80_none/27802/Hope-Downs-1-Gap-Tonnes-Study-2.webp)  

  [  ![Hope Downs 1 Gap Tonnes Study 1](https://emtek.com.au/volumes/images/Projects/2015/_2100x1350_crop_center-center_none/27801/Hope-Downs-1-Gap-Tonnes-Study-1.webp) ](https://emtek.com.au/volumes/images/Projects/2015/_1800xAUTO_crop_center-center_80_none/27801/Hope-Downs-1-Gap-Tonnes-Study-1.webp)  

 

 

 

 

 ## Related Projects

 

 

  [  ![MTK24044002 IMG 8795](https://emtek.com.au/volumes/images/Projects/_600x600_crop_center-center_none/54784/IMG_8795.webp) 

 

 ### Maxwell Drift Conveyor Head End and Stacker

- **Client:** Nepean Conveyors
- **Location:** Maxwell Project, Woodlands Drift
- **Date:** 2024
 
 View project   

  ](https://emtek.com.au/projects/maxwell-drift-conveyor-head-end-and-stacker) 

  [  ![Take Up Maintenance Winch 1](https://emtek.com.au/volumes/images/Projects/2020/_600x600_crop_center-center_none/28045/Take-Up-Maintenance-Winch-1.webp) 

 

 ### Conveyor Take-Up Maintenance Winch

- **Client:** Fortescue
- **Location:** Pilbara, Western Australia
- **Date:** 2020
 
 View project   

  ](https://emtek.com.au/projects/take-up-maintenance-winch) 

 

 

 

 

[View all Projects](https://emtek.com.au/projects)
