---
title: Fire System Upgrade
date: 2023-12-22T09:08:00+11:00
author: Walker Designs
canonical_url: "https://emtek.com.au/projects/mesa-a-j-fire-system-upgrade"
section: Projects
---
1. [ Home](https://emtek.com.au/)
2. [Projects](https://emtek.com.au/projects)
3. Fire System Upgrade
 
 

 

 

 

  ![Mesa A J Fire System Upgrade Main 1](https://emtek.com.au/volumes/images/Projects/2020/_3500x1800_crop_center-center_none/27382/Mesa-A-J-Fire-System-Upgrade-Main-1.webp) 

#  Fire System Upgrade 

- **Client:** Rio Tinto Ltd
- **Location:** Pilbara, Western Australia
- **Date:** 2020
 
 

 

 

 

 

 

 

  ### Project Scope

When Rio Tinto upgraded elements of the fire protection systems within the Mesa A&amp;J plants, EMtek completed a study to ensure the fire protection systems provided a level of protection that reduced the risk of damage to the company's assets and loss of production in the event of a fire to an acceptable level by ensuring that the fire systems were in compliance with applicable Australian and RTIO standards.

 

### Major Work Inclusions

- Data review, request and collection.
- Site investigation and weekly progress meetings.
- Verification of site as-built data.
- Surveying of existing infrastructure including pumps, tanks, pipes and hydrants etc.
- Study report to include calculations, sketches and recommendations.
- Safety in design HAZID register.
- Multidiscipline Detailed engineering and design of new Fire system infrastructure based on report findings
- Project implementation, Management and controls
- Onsite construction support and commissioning

 

 

 

 

 

   [  ![Mesa A J Fire System Upgrade Main 1](https://emtek.com.au/volumes/images/Projects/2020/_2100x1350_crop_center-center_none/27382/Mesa-A-J-Fire-System-Upgrade-Main-1.webp) ](https://emtek.com.au/volumes/images/Projects/2020/_1800xAUTO_crop_center-center_80_none/27382/Mesa-A-J-Fire-System-Upgrade-Main-1.webp)  

  [  ![Mesa AJ Fire System Upgrade](https://emtek.com.au/volumes/images/Projects/2020/_2100x1350_crop_center-center_none/27381/Mesa-AJ-Fire-System-Upgrade.webp) ](https://emtek.com.au/volumes/images/Projects/2020/_1800xAUTO_crop_center-center_80_none/27381/Mesa-AJ-Fire-System-Upgrade.webp)  

 

 

 

 

 ## Related Projects

 

 

  [  ![Hall Hub Rail Crossing](https://emtek.com.au/volumes/images/Content/_600x600_crop_center-center_none/39537/Hall-Hub-Rail-Crossing.webp) 

 

 ### Hall Hub Development Overland Conveyor

- **Client:** Fortescue
- **Location:** Pilbara, Western Australia
- **Date:** 2023 - 2024
 
 View project   

  ](https://emtek.com.au/projects/hall-hub-development-overland-conveyor) 

  [  ![Core Shed Detailed Design 1](https://emtek.com.au/volumes/images/Projects/2019/_600x600_crop_center-center_none/27201/Core-Shed-Detailed-Design-1.webp) 

 

 ### Core Shed Detailed Design

- **Client:** Kirkland Lake Gold
- **Location:** Bendigo, Victoria
- **Date:** 2019
 
 View project   

  ](https://emtek.com.au/projects/core-shed-detailed-design) 

 

 

 

 

[View all Projects](https://emtek.com.au/projects)
