Fixed Plant Guarding Detailed Design Main 1

Fixed Plant Guarding Detailed Design

  • Client: Rio Tinto Ltd
  • Location: Pilbara, Western Australia
  • Date: 2021

Project Scope

When Rio Tinto implemented a multi-site plan to ensure that safety guarding complied with regulatory and statutory requirements, EMtek was proud to provide support by developing the design for an improved guarding arrangement across Rio Tinto's Yandicoogina (Yandi) and West Angelas (WAN) sites. Audit and risk assessments were conducted across the Yandi and WAN sites, which highlighted multiple assets that required guard defect remediation in order to be compliant with the Australian standards and Government regulations. 

Due to these findings, Rio Tinto took measures to rectify the safety guards deemed non-compliant. EMtek recently completed a study, which built on the previous risk assessments and proposed concepts for guard defect elimination. The SOW included the engineering, design and detailing required to complete the fixed plant guarding upgrades at the Yandi and WAN sites.

Major Work Inclusions

  • Site visit to conduct detailed site measurements, site verification and 3D scanning of the areas listed in the design envelop report.
  • Review of existing drawings and models for accuracy and relevancy.
  • Convert 3D scans to 3D models to verify and develop existing models for the purpose of designing new guarding arrangements.
  • Prepare and conduct preliminary presentation of concept designs on site, timing and resources to be coordinated with Rio Tinto.
  • Back drafting and incorporation of feedback into 3D model.
  • Prepare and conduct final presentation for confirmation of final designs on site.
  • Prepare and submit shop detail packages to be fabricated and installed by external parties.
  • Project management of the detailed design.
  • Progress reporting.