Dust Mitigation Project 2

Dust Mitigation Project

  • Client: Minprovise
  • Location: Pilbara, Western Australia
  • Date: 2021

Project Scope

EMtek was proud to support specialist engineering group Minprovise, through designing a new dust collection system for extraction and disposal of dust emitted from material transfer points HDCV53/HDCV54 and HDCV54/HDCV55 at South Plant and HDCV55/HDCV01 at North Plant at the Hope Downs 1 mine site. 

Major Work Inclusions

  • Project and engineering management.
  • Project controls and reporting.
  • Site visits and design reviews.
  • Baghouse structure.
  • Baghouse concrete foundation.
  • Dusting system including supports.
  • Extraction hoods and covers.
  • Electrical design.
  • Control system design and coding.
  • Air and water supply pipework and supports to vendor equipment.
  • Control system implementation, commissioning and training.