Western Turner Syncline 2
- Client: Mondium, Rio Tinto
- Location: Pilbara, Western Australia
- Date: 2019
View project
EMtek was proud to support specialist engineering group Minprovise, through designing a new dust collection system for extraction and disposal of dust emitted from material transfer points HDCV53/HDCV54 and HDCV54/HDCV55 at South Plant and HDCV55/HDCV01 at North Plant at the Hope Downs 1 mine site.