Based on projected core volumes, the team at Fosterville Gold Mine proposed to install a fit for purpose core processing facility within the zoned perimeter of the existing mining lease. The new facility resulted in a number of improvements including an increase in process efficiency, reduction in operating costs, reduction in manual handling exposure, reduced vehicle/pedestrian interaction, increased security for core samples and improvement in communication between drill operators and core processing teams.