
Paste Plant, Mine Water Treatment, Gold room, Cyanide Plant
- Client: Agnico Eagle
- Location: Fosterville Gold Mine, Victoria
- Date: 2017 - 2018
View project
EMtek completed an engineering study to assess the feasibility of achieving Conveyor belt wear reduction through optimisation of the loading condition by varying belt speed to suit production rates. All conveyors subject to the study are equipped with variable speed drives.
Assessing the feasibility of varying belt speeds to achieve reduction in conveyor belt wear including:
Additional Work: